Skip to the guide

One program

Schedule preview, dates and activation.

What this page is for

This is the page of one program. It shows which template version the program runs, lets you change the start date and the holiday calendar while the program is a Draft, previews the whole schedule with real due dates, and is where you activate the program. Below the schedule is the roster of interns.

Where
Press a program's card on Programs (address /programs, then the program)
Who can open it
Administrators can edit a draft and activate it. View-only support logins can look but not change.
App
Program Studio

How a draft program becomes active

From a draft program to an active one
YouCraftBridgeIQNot right yetOpen the draftprogramAdjust the startdate or holidaycalendarRead the ResolvedschedulePress Activate… andtype the cohortnameWrites everyintern'sassignments andfreezes the datesThe program isActive
The same steps as a list
  1. Open the draft program
  2. Adjust the start date or holiday calendar
  3. Read the Resolved schedule (Not right yet: Adjust the start date or holiday calendar; next: Press Activate… and type the cohort name)
  4. Press Activate… and type the cohort name
  5. Writes every intern's assignments and freezes the dates
  6. The program is Active

The screen

A draft program's page with its name and dates, a Draft badge, Activate, the pinned version, a start date card and schedule settings.
The top of a draft program. The numbers match the table below.
No.ControlWhat it doesWhat happens next
1← ProgramsA link back to the list of programs.Opens Programs.
2Guide Demo Winter CohortThe program's cohort name.Nothing; it is a label.
37 Dec 2026 to 28 Dec 2026 · America/ChicagoThe first and last day of the program, then its timezone. The last day is worked out for you.Nothing; it is a label. It changes when you change the start date or calendar.
4DraftThe status: Draft, Active, Completed or Cancelled.Nothing; it is a label.
5Activate…Opens the activation check. Shown on a draft to administrators once the schedule has loaded.The Activate program box opens.
6Version 1The template version this program runs, under Pinned template version.Opens that version in the editor, read-only.
7Start dateA date box for the program's first day. Shown only on a draft, to administrators.Change the date, then press Update.
8UpdateSaves a new start date. Greyed out until the date is different. It reads Saving… while it works.A confirmation appears and the end date and schedule are recalculated.
9Holiday calendarWhich calendar's holidays the program skips. Shown as a list on a draft. None is listed only while the program has no calendar.Press Update to save the choice.
10UpdateSaves the calendar choice. Greyed out until the choice is different. It reads Saving… while it works.A confirmation appears and the end date and schedule are recalculated.
11+ New calendarMakes a new, empty calendar without leaving the page: New calendar name, Cancel and Create calendar.The new calendar is picked in the list. Press Update to use it.
12Manage calendarsA link to the holiday calendars page.Opens Holiday calendars.
Pinned template versionThe card heading above the version link, with a note that the version is pinned permanently.Nothing; it is a label.
Schedule settingsThe card heading above the holiday calendar.Nothing; it is a label.

Scroll down for the schedule:

The Resolved schedule with three week cards listing activities by day, a line about the skipped holiday and the start of the Roster.
The resolved schedule. The numbers match the table below.
No.ControlWhat it doesWhat happens next
1Resolved scheduleThe heading, with how many weeks and activities each intern will get, for example 3 weeks and 6 activities per intern.Nothing; it is a label.
2Week 1One card per week, with its number and title.Nothing; it is a display.
3starts Mon, Dec 7The day the week starts.Nothing; it is a display.
4Read the safety handbookAn activity, on the left the day it is due. After the title come its type and, if set, its estimated minutes, for example Reading · 60m.Nothing; it is a display.
5Holidays skipped inside this program:The holidays of the chosen calendar that fall inside the program. Work that would land on one moves later. Shown only when there are some.Nothing; it is a display.
No activities in this week.Shown in a week card that has no activities.Nothing; it is a display.

The box that opens when you press Activate…:

The Activate program box with a warning, the run dates, weeks, activities, enrolled interns, assignments, a note about holidays and a confirmation field.
The activation check. The numbers match the table below.
No.ControlWhat it doesWhat happens next
1Activate program, the box titleThe title of the box.Nothing; it is a label.
2Activation writes every intern's assignments and freezes the dates.The yellow warning. Start date, timezone and holiday calendar cannot be changed afterwards.Nothing; it is a notice.
3RunsThe program's first and last day.Nothing; it is a display.
4Assignments to createHow many assignments will be written: one for each activity for each enrolled intern.Nothing; it is a display.
5Type “Guide Demo Winter Cohort” to confirmA box where you type the cohort name exactly. Your program's name appears in the label.Activate program stays greyed out until it matches.
6CancelCloses the box without activating.You are back on the program page.
7Activate programActivates the program. It reads Activating… while it works.A confirmation appears and the program becomes Active.
WeeksHow many weeks the schedule has.Nothing; it is a display.
Activities per internHow many activities each intern gets.Nothing; it is a display.
Enrolled internsHow many interns are on the roster now.Nothing; it is a display.
fall inside this programA grey box shown when holidays fall in the program: how many, which days, and that work shifts later rather than being dropped.Nothing; it is a notice.
No interns are enrolled yet.A grey box shown when the roster is empty. You can still activate; interns enrolled later get the same cohort dates.Nothing; it is a notice.

An active program has no edit controls and says why:

An Active program's page with a grey note that its dates are frozen, the pinned version and a read-only holiday calendar line.
An active program. The numbers match the table below.
No.ControlWhat it doesWhat happens next
1ActiveThe status badge.Nothing; it is a label.
2This program is active. Its start date, timezone, and holiday calendar are frozen, they're already baked into every intern's assignments.A note shown on every program that is not a Draft. It names the status in lower case.Nothing; it is a notice.
3Read-only, the calendar was applied when this program was activated.Replaces the holiday calendar list. The calendar's name is shown above it, or No holiday calendar.Nothing; it is a display.

Step by step

Change the start date of a draft

  1. Open the draft program.
  2. In the Start date card, pick a new date.
  3. Press Update.

The end date and the whole schedule below are recalculated.

Change the holiday calendar of a draft

  1. In Schedule settings, open the Holiday calendar list.
  2. Choose a calendar. To make a new one, press + New calendar first.
  3. Press Update.

Check the schedule

  1. Scroll to Resolved schedule.
  2. Read each week: the start day, and the due day beside each activity.
  3. Look at Holidays skipped inside this program to see which days were skipped.

Activate a program

  1. Add the interns you want on the roster first, if you can. See Adding interns.
  2. Press Activate… at the top right.
  3. Read the numbers: dates, weeks, activities, enrolled interns and assignments to create.
  4. Type the cohort name in the confirmation box, exactly as it is written in the label.
  5. Press Activate program.

The product writes every enrolled intern’s assignments and the program becomes Active. You can still add interns afterwards. Anyone enrolled later gets the same cohort dates.

Look at the pinned version

  1. Press Version, then its number, under Pinned template version.

The fields you can edit

FieldRequiredRulesExample
Start dateYesA calendar date. Only on a draft. Update stays greyed out until it differs from the saved date.7 June 2027
Holiday calendarNoOne of your calendars. Only on a draft. Update stays greyed out until it differs from the saved calendar.United States holidays
Type “Guide Demo Winter Cohort” to confirmYesMust match the cohort name exactly, apart from spaces at the start or end. Up to 200 characters.Guide Demo Winter Cohort

Messages you can see

MessageWhen you see itWhat to do
Start date updated, the schedule has been recalculatedAfter Update works on the Start date card.Nothing.
Holiday calendar updated, the schedule has been recalculatedAfter Update works on the holiday calendar.Nothing.
Program activated, 18 assignments created for 3 intern(s)After Activate program works. The numbers are filled in.Nothing. The program is now Active.
Couldn't update the start date.Update failed and the server gave no more specific reason. A more specific server message is shown in its place when there is one.Try again.
Couldn't update the holiday calendar.Update failed and the server gave no more specific reason.Try again.
Couldn't activate this program.Activate program failed and the server gave no more specific reason.Try again.
Calendar "US Federal Holidays 2027" createdAfter Create calendar works.Nothing. The calendar is picked in the list; press Update to use it.
Couldn't create that calendar.Create calendar failed.Try again.
This program is active. Its start date, timezone, and holiday calendar are frozen, they're already baked into every intern's assignments.You open a program that is not a Draft.Nothing. Dates cannot be changed.
No holiday calendarIn place of the calendar list on a program with no calendar that cannot be edited.Nothing.
Calendar no longer availableThe program's calendar could not be found in your calendars.Nothing.
View only, this account can't change the calendar.A support login opens a draft program.Ask your administrator.
No activities in this week.A week card has no activities.Fix the template version; see the editor page.
Resolving…While the schedule is being worked out.Wait.
Couldn't resolve this schedule.The schedule could not be worked out.Press Try again beside it.
Couldn't load this program.The program could not load. It replaces the page.Press Try again.
Couldn't load the pinned version.The version link could not load.Press Try again beside it.
Couldn't load holiday calendars.The calendar list could not load.Press Try again beside it.
This account can view but not change data.A support login's change was refused by the server.Ask your administrator.

Limits and other roles

  • Start date and holiday calendar can only be changed while the program is a Draft.
  • Activation cannot be undone, and after it the start date, timezone and holiday calendar are frozen.
  • The version and the timezone are set when the program is created. This page has no control to change them.
  • Activate… appears only after the schedule has loaded.

Common questions

Why is there no Activate… button?

The program is not a Draft any more, the schedule has not loaded yet, or you are signed in as a support login.

Why can't I change the start date?

Once a program is activated its dates are written into every intern’s assignments, so they are frozen. Only a draft can be changed.

I published a newer version. Does this program use it?

No. The program is pinned to the version it was created from. Create a new program from the newer version.

What does a holiday do to the schedule?

Work that would be due on a holiday moves later instead of being dropped, so the end date can be later than the plain number of weeks. The schedule lists the holidays it skipped.

Can I activate with no interns?

Yes. The box says No interns are enrolled yet. Anyone enrolled later gets the same cohort dates.

Last checked 2026-11-03 against the product.